Calem Blogs

Blogs of CalemEAM
Aug
28

Badges for New Work Orders and Service Requests


 Badges are introduced for new work orders and service requests in the coming release of R2022e for Q4 2022. The badges provide a quick glimpse of new work orders and service requests in Calem.The number of work orders of status "New" is shown as a badge.The number of service requests of status "New" is shown as a badge.If the n...
Continue reading
  1769 Hits
1769 Hits
Aug
24

How to Implement Calem for Multiple Business Units?


There are two options when selecting an architecture to implement Calem for multiple business units of an organization. For instance, a manufacturing company chooses Calem as their CMMS solution for its plants.  Option 1: One Calem is implemented. All plants uses the same Calem.Option 2: One Calem is implemented for each pl...
Continue reading
  1502 Hits
Tags:
1502 Hits
Aug
10

How Not to Share PM Plans


PM Plans are job description including checklist to do, material requirement, documents such as instructions, etc. A common practice is to share PM Plans across business units for consistency. However, there are cases that PM plans remain different across business units based on operational requirements. PM plans are not shared. Each...
Continue reading
  2425 Hits
Tags:
2425 Hits
Aug
09

What Was Done in Last Shift from Calem Mobile


Dashboard has been added to the Calem Mobile in the coming release of Calem R2022d in August 2022. It addressed a question often asked in the field: What was done in the last shift?The dashboard includes KPIs and work order log book.  1. Dashboard The dashboard includes the following KPIs. The default period is last 1 day (from the s...
Continue reading
  1560 Hits
Tags:
1560 Hits
Jul
24

When to Use Location Relation Diagram


Location relation is available in the coming release of Calem R2022d. It is similar to the asset relation in Calem.  One use case for the location relation is to manage device connectivity for impact analysis. It is a better option than using asset directly. A configuration element (CE) in Calem is a location with attributes for conf...
Continue reading
  1728 Hits
Tags:
1728 Hits
Jul
22

How to Manage Lookups for Multi-Tenants


Calem provides options of implementation when it comes to multi-tenants. Multi-Site is an option for a client to implement asset maintenance services of multiple plants, or departments in a Calem service. For instance, an organization has manufacturing operations across the globe. A Calem service is used to manage the ...
Continue reading
  1792 Hits
Tags:
1792 Hits
Jul
21

How to Enable "Review Required" for Work Orders


The checkbox "Review Required" in work orders may require a user to "Accept" or "Reject" a work order after completion before it can be closed. It is a good practice to review a completed work order. A work order of "Accepted" status will be closed by Calem automatically after 48 hours, saving time in closing work orde...
Continue reading
  1871 Hits
Tags:
1871 Hits
Jul
14

When to Use Item Owner Groups


This feature is introduced to enable item access control. One use case is to segregate technical parts from non-technical parts in purchasing control: Buyers responsible for technical spare parts can purchase spare parts in requisition and purchase orders.Buyers who are not authorized to purchase technical spare parts can only place non-technical i...
Continue reading
  2030 Hits
Tags:
2030 Hits
Jun
13

Quick Reading Entry for Calem Mobile


Quick reading entry is available in Calem Mobile in the coming release of Calem R2022c. The color-coded readings indicate if a reading raised an alarm (in red), or is normal (green).  This blog discusses the new settings in R2022c for weekly and monthly quick reading entries.  1. Weekly and Monthly Readings A reading freque...
Continue reading
  2015 Hits
2015 Hits
Jun
07

When to Close Work Orders without Acceptance


Acceptance is a step in the life-cycle of work orders for a customer or supervisor to accept work completed. For instance, a repair work order is accepted by an operations manager; a PM work order is accepted by a maintenance supervisor. Use the following chart to determine if there are too many work orders to be accepted:  Dashboard | Summary...
Continue reading
  1752 Hits
Tags:
1752 Hits
May
10

Tips to Browse Open Work Orders


Open work orders represent current maintenance work load. They need to be actively managed for approval, planning and execution. There are various views in Calem to browse open work orders including Open WO (PMs) and Open WO (Non-PMs) in the coming release of R2022b for May 2022. This blog summarizes various ways to view open work orders....
Continue reading
  2130 Hits
Tags:
2130 Hits
May
04

Weekly Scheduling for Own Teams


A new team-based weekly scheduling is available in the coming release of Calem R2022b planned for May 2022. It allows one to configure WO planners to do weekly scheduling for their own teams. 1. "Scheduling Own Teams" Flag A new flag is added in the monitor user form for users to do weekly scheduling for their teams. It is a producti...
Continue reading
  1991 Hits
Tags:
1991 Hits
May
03

Comparing Weekly vs Weeks of PM Schedules


There are two types of schedules when managing repeat tasks by weeks. Their differences are demonstrated by examples below. A. "Weekly" schedule. It allows one to schedule a task to happen every week on one or more week days.A next due date is calculated from the next day after the starting date, and find the next due day by mov...
Continue reading
  2046 Hits
Tags:
2046 Hits
Apr
30

Work Orders Notes by Speech Recognition


Accurate and detailed notes are important in work orders. They provide a truthful document trail of maintenance and repair of assets critical to businesses. Speech recognition in mobile devices can make the job easier for technicians to enter notes by speaking. The following is a sample case of adding a note to a work order by v...
Continue reading
  2550 Hits
Tags:
2550 Hits
Apr
29

How to Turn Off Calem Mobile per User Profiles


There are cases a Calem admin needs to turn off Calem Mobile. For instance, a Calem admin is working on processes and screen customization for Calem web. The same will be done for Calem Mobile at a later time. It would make sense to turn off Calem Mobile for the time being. This blog discusses steps a Calem admin can take to turn off...
Continue reading
  2055 Hits
Tags:
2055 Hits
Apr
27

Tips in Adding Short Videos to a Work Order


 In the coming release of Calem R2022b short videos can be added to work orders in Calem Mobile. Calem Mobile needs to be upgraded from App Store (iOS devices) or Google Play (Android devices).Search "CalemEAM" if you are installing Calem Mobile the first time.See this blog for more info.This feature is available in Ca...
Continue reading
  2299 Hits
Tags:
2299 Hits
Apr
24

How to Manage Work Orders Assigned to Me and My Team


There are productive facilities in Calem for managing work orders assigned to the login user or the teams of the login user. These forms can be used by both web and mobile users. 1. My Assignment/Team in Calem Web The following use cases are supported to streamline work order management for web users. A technician may use My Assignme...
Continue reading
  2219 Hits
Tags:
2219 Hits
Apr
22

How to Reset "Qty to Order" in Site Inventory


Inventory "Qty to Order" and "Qty on Order" might be off in Calem due to the following factors: When an inventory is uploaded the ordering is not triggered by minimum/maximum stock control and order generation.  This is by design because you may upload inventory with min/max and order creation configuration, followed by uploadin...
Continue reading
  2186 Hits
Tags:
2186 Hits
Apr
06

How to Test Emails in Calem


Workflow emails are available in Calem. Outbound emails are placed in a email queue. The email queue is sent out by a server process running in the background as a repeat cron job. This blog present an option to manually trigger email processing. This option might be useful for Calem Admins. For instance, you are not ready to turn on outb...
Continue reading
  1744 Hits
Tags:
1744 Hits
Mar
29

How to Manage Inventory Items Individually (or Item Serialization)


Inventory items are managed in bulk by bin/quantities in storerooms typically in Calem. For instance, there are three spark plugs in shelf 1 at the maintenance storeroom. However, managing inventory in bulk might not be sufficient for all organizations. For instance, there are three high precision cameras tha...
Continue reading
  2269 Hits
Tags:
2269 Hits