Clay's Blog

These are the official blogs about CalemEAM.

Work Premature Ending

​There are cases a worker has to stop on a work order prematurely and hand the work over to someone else.  Calem supports the use case through the use of "On Hold" status. Here're the steps: Identify the work order that one needs to stop prematurely. Edit the work order and change its status to "On hold". Save the status change. Cale...
Continue reading
  3662 Hits
3662 Hits

How to Configure Boilerplate Work Order Steps by PM Plans

This blog is a tutorial of using PM Plans as default work order steps or safety procedures. Here is one use case we will use in this blog: All corrective and PM work orders must have the same safety procedures consisting of the following 7 steps: Notify Supervisor/Manager of the affected machine or area Apply Lock-Out Tag-Out when needed Ensur...
Continue reading
  4162 Hits
4162 Hits

Dropdown Menu Auto-Open

In release R10 the dropdown menu in a toolbar will auto-open when a mouse is over it. This feature saves a mouse click and allows one to pick a menu quickly.
  3720 Hits
3720 Hits

Boilerplate Steps in PM Plan (Deprecated)

This blog is deprecated. It is superseded by How to Configure Boilerplate Work Order Steps by PM Plans . Boilerplate steps/safety notes can be configured for both corrective (manually created work orders) and generated work orders (from PMs). For example, there are four steps to be performed for each PM, and a few steps to be performed fo...
Continue reading
  4140 Hits
4140 Hits

Asset Item in R10

Note: this blog is superseded by Asset Item and Bill of Material , and  Categorization and Category Attributes in R11 available in Spring 2018. ​  ​Asset Category and Sub-Category is replaced by categorization hierarchy. Asset Group is renamed to Asset Item from R11d. Category, Sub-Category and Asset Item Assets are grouped in the followi...
Continue reading
  4274 Hits
4274 Hits

Bulk Update by Data Export and Import

The integration module allows administrators to perform bulk data initialization or updates. ​You can craft an excel template from a report and export data to store off the excel file. Use the same excel file to populate data and upload data to Calem. 1. Data Upload Calem provides a few ways to upload data based on your business requireme...
Continue reading
  6557 Hits
6557 Hits

Sort Weekly Schedule by Team

​Team column has been set in weekly schedule screen (menu path: Schedule module | Weekly Schedule) so one can sort the users by the team. It is available in release R10 in January 2016.
  3485 Hits
3485 Hits

Asset Category Attributes

Note: this blog is superseded by  Categorization and Category Attributes  in R11 available in Spring 2018. Asset Category and Sub-Category Asset category and sub-category are used to organize assets and configuration items in Calem. Inside a sub-category, you may organize assets into asset groups. For example, you have defined an asset gr...
Continue reading
  4565 Hits
4565 Hits

Scheduled Reports (Deprecated)

This blog is superseded by a new blog:  How to Set up Scheduled Reports in Calem Scheduled reports allow one to set up reports to be generated on a future date and emailed to users. It is a new feature added in R10. A few reports are available as scheduled reports. More scheduled reports will be added based on customer feedback. Here is a...
Continue reading
  3447 Hits
3447 Hits

Meter Triggered Work Orders

​ Meter triggers define the ranges of readings that meter events should be fired. For instance, one can define meter triggers for engine temperature readings. If an engine's temperature is too high, a trigger is fired.  You can define meter triggers to kick off work orders in Calem. Here are the steps: ​Define meter triggers for meter gro...
Continue reading
  3880 Hits
3880 Hits